This is the same page which I put in the case of District Consumer Forum in 2012.
In this document- I write about their specification - they gave with lot of faults in it...
This project is in Sector-112, with the name of Somdatt Landmark. The marketing Partner is MongaRealtors.
So Beware while you are purchasing the flat here and dealing with such marketing agents.
Here is the--
In this document- I write about their specification - they gave with lot of faults in it...
This project is in Sector-112, with the name of Somdatt Landmark. The marketing Partner is MongaRealtors.
So Beware while you are purchasing the flat here and dealing with such marketing agents.
Here is the--
Proposed
Specifications
|
|
|
|
|
|
|
Applied or Not
|
Condition
|
Problem
|
Structure:
|
Earthquake resistant RCC frame
structure as per seismic Zone IV
|
|
|
Don’t Know- Want a certificate from
them for the same.
|
Living/ Dining /Lobby:
|
|
|
|
|
Flooring
|
Vitrified Titles
|
Yes
|
Defective
|
90% Titles are hollow. Even there
are movement in tile
|
Walls
|
Acrylic Emulsion paint
|
Yes
|
Defective
|
Walls are NOT smooth. They applied the paint on unleveled wall. Layers of paints starts moving out…
|
Ceiling
|
POP punning with oil bound distemper
|
Yes
|
Defective
|
Not smooth- POP work is not clean.
|
Master Bedroom/Bedrooms:
|
|
|
|
|
Flooring
|
Vitrified Titles
|
|
|
90% Titles are hollow. Even they
are movement in tiles
|
Walls
|
Acrylic Emulsion paint
|
|
|
Walls are NOT smooth. They applied the paint on unleveled wall. Layers of paint…
|
Ceiling
|
POP punning with oil bound
distemper
|
|
|
Not smooth- POP work is not clean.
|
Doors:
|
|
|
|
|
Internal Doors
|
Painted hardwood frame with
polished molded shutter
|
Yes
|
Defective
|
Not painted well. Bathroom Doors
are defective.
|
Entrance door
|
Veneered and polished molded shutter
|
Yes
|
Defective
|
Door is cracked. And not have
enough strength. Unable to create the isolate environment. Lot sound/air
comes from out side
|
Hardware
|
Brass/ Stainless Steel
|
No
|
|
Iron Grill used in gallery. Door hinges are of Iron. Starts corrosion
|
Windows:
|
Natural anodized aluminum windows
with glass shutter
|
Don’t Know
|
Defective
|
It hard to sit in the room in winter. Lot of air cross from the gaps. Even water enter in the room in rainy day
|
Toilets:
|
|
|
|
|
Walls
|
Combination of Titles & acrylic
emulsion.
|
Yes
|
Defective
|
Tiles are assembled well. They are
hollow/ level problem/ Lot of marks on titles. Short tiles they place.
Cutting of titles are proper
|
Floor
|
Antiskid titles
|
Yes
|
Defective
|
Not leveled and hollow from
the bottom
|
Counter
|
Granite counter
|
Yes
|
Defective
|
The Platform on which it is placed
is properly made. The iron rods are clearly visible
|
Fitting /Fixtures
|
European W.C.C.P fittings
|
NO
|
Defective
|
All are Chinese fitting. Even they
are not ready to tell what they fitted. Many times taps leakage there.
|
Others
|
Exhaust fan geysers.
|
Yes
|
OK
|
|
Kitchen:
|
Modular Kitchen
|
Yes
|
Defective
|
Poor quality boards are there. Even paints of boards starts disappear. Boards are not cutted well. Termites in the board
|
Walls
|
Ceramic titles upto 2'-0'', Granite counter and oil bound distemper in remaing areas
|
Yes(Partially)
|
Defective
|
All walls are not painted. Titles are not cutted well. They cutted the titles excessively for switch boards.
|
Floor
|
Vitrified Titles /Antiskid Titles
|
Yes
|
Defective
|
Title cracked and hollow. They are
movement in tiles.
|
Counter
|
Granite counter
|
Yes
|
Defective
|
But there are not enough support
|
Fittings / Fixtures
|
Cp fittings, double bowl stainless
still sink and drain
|
Yes
|
Defective
|
Chinese fitting there. Lot of ACID
marks in Sink
|
Others
|
Exhaust fan
|
|
|
|
Electrical Work
|
Electrical work with copper wires
in concealed PVC conduits, modular switches, telephone & TV points
|
Yes
|
Defective
|
switch boards are loosely
assembled. 3-in 1 switch missing from the bathroom.
|
|
|
|
|
|
Security System
|
24 hours Security. CCTV at the
entrance lobby at the ground floor
|
Yes
|
|
Just placed at the end of February
|
|
Intercom facility in each apartment
|
Yes
|
|
Just placed at the end of February
|
Drinking water
|
24 hours water supply
|
Yes
|
|
But maybe they are not clean the
water tanks regularly. No-body ready to tell when/how they clean the tank.
Water always leaks from the tank. Lot of water wasted here.
|
Connectivity
|
Intercom facility
|
Yes
|
|
Just placed at the end of February
|
|
provision for cable TV
|
|
|
I never checked this port- so no
comments
|
|
provision for broadband connectivity
|
No
|
|
|
|
|
|
|
|
Electrical Power Backup
|
100% electrical backup for common
area and for fans
|
Yes
|
|
Assembled second hand generator.
And charge Rs12.60/unit
|
|
Lights and fridge in the apartments
|
|
|
|
Air Conditioning:
|
Provision for air Conditioners.
|
Yes
|
Defective
|
A big hole in the wall. Not shaped.
|
External Finnish
|
Textured Finish
|
Don’t Know
|
|
Just Simple paint
|
0 comments:
Post a Comment